US Steel, Gary Indiana

From 2010 - 2013, CMA conducted a groundwater discharge assessment at the US Steel Plant in Gary Indiana. The work encompassed a comprehensive field effort including Trident screening, Trident porwater sampling, surface water sampling, piezometer installations, drag probe surveys, UltraSeep surveys, and sediment sampling.